Skeletal Construction: 
Temporary Bus Shelter.
Group work with Andika Setiabudi, Mashruk Aswad, Naim Rosli & Zulkarnain Richard.
We were required to produce a shelter based on the understanding of skeletal construction and its joints. It should be made out of specific recycle materials that reflects the materials used in actual construction. The shelter was tested to determine its strength and students will be required to analyze the success or failure of their shelter. Analysis had indicate us understanding of skeletal construction, its joints, loads and forces experienced in a skeletal structure.
​​​​​​​In this project I contributed most to the on going process of the group, (the starter I suppose), compiling, understanding all data to be compiled & design of the report layout. Naim was mainly a responsible leader in this project.
These are the beginning thought & brainstorming process between all group members.
The model & drawing of temporary Bus Shelter  in the process
Here are some image processes of how the real model 1:5 scale is created (+full specs)
Our model + how we also test out the strength of our 1:5 Temporary Bus Shelter.

Snippets of our report book handled most by myself & guidance of Naim Rosli.
Temporary Bus Shelter.
Published:

Temporary Bus Shelter.

We were required to produce a shelter based on the understanding of skeletal construction and its joints. It should be made out of specific rec Read More

Published:

Creative Fields