Mike Taylor's profile

Cambie Corridor Street Model

Downtown East Side Site Model
 Hastings Corridor
My Year 3 Environmental Design class was tasked with creating a 1:250 card model of Vancouver's downtown eastside neighbourhood. This model would serve as a basis for further work in the studio, as well as an introduction to modeling techniques. My group of 3 was given five blocks of the East Hastings corridor as our site.
Cambie Corridor Street Model
Published:

Cambie Corridor Street Model

a 1:250 physical model of the Hastings corridor in Vancouver.

Published:

Creative Fields