Mike Horrell's profile

2nd Year Engineering Project - Manufacturing

Executive Summary
The client is a new start up company looking to break into the Coil Winding
Market, and wanted a product that would stand out and differentiate themselves from the rest. As
the client had no preferences to the specific type of coil winder, it created many design challenges
around specifications that UP Group has outlined in this report. A particular emphasis in this
report is the production plan and feasibility studies. These allow the client to make informed
decisions on material selection, processing of those materials, logistics and warehousing options
that will ensure the smartCoil® remains a robust design within the variability. In addition, the
sensitivity analysis around batch runs, and other financial variables provides powerful risk
assessment options for shareholders and investors.
2nd Year Engineering Project - Manufacturing
Published:

2nd Year Engineering Project - Manufacturing

Paper Description: The design and development of solutions to engineering problems with “concurrent engineering” capability is a core activity fo Read More

Published: