Gun Racks : Comission Work | Summer 2014

  • Small comission work to fabricate four brass gun racks.
  • soldered connection
  • brass rod was threaded and attached to base
  • holes were drilled and countersunk for future installation
  • Process
    holes were drilled and tapped in both ball bearrings and rods
  • rods were bent on diacro rod bender
  • ball bearrings were attached to bent rods with threaded rod cut to length
  • milling base
  • polished and waxed for pick up
  • Final Product
  • Thank you
     
    Disclaimer: I do not take ownership over this design, but was asked to fabricate it.